Open-air treehouses & tree forts
Platforms, railings, roofs, and clever nooks designed for fresh air, sightlines, and pure imagination. The classic backyard hideout, done right.
Cape Cod & Massachusetts · Since 2019
Owner-built by Tony Pola. Open-air tree forts, weathertight hideaways, ziplines, climbing walls, rope bridges, and the safe hardware that holds it all together — designed around your kids, your trees, and your backyard.
Built safe. Built custom. Built for memories.
Services
Every treehouse is one-of-one — designed around your trees, your kids, and the way your family already plays in the backyard.
Platforms, railings, roofs, and clever nooks designed for fresh air, sightlines, and pure imagination. The classic backyard hideout, done right.
Insulated walls, real windows, sturdy doors, proper roofing. A four-season clubhouse — for sleepovers, reading forts, and the occasional adult escape.
Ziplines, climbing walls, rope bridges, cargo nets, fire poles, slides — engineered with proper hardware, tensioning, and landing zones.
Annual once-overs, hardware checks, zipline tension and brake adjustments, decking and railing refresh. Older treehouse from another builder? We can take a look.
Ground-level decks, elevated landings, switchback stairs, and code-minded railings — built to match the look and longevity of the treehouse above.
Cedar shingle, board-and-batten, live-edge accents, stained pine, painted clapboard. We help you pick a finish that ages well in the New England weather.
Cost guide
The honest answer: it depends on the tree, the dream, and the details. A simple open-air platform with a railing and a ladder is one budget. A two-room, weathertight hideaway with a zipline, climbing wall, and cedar siding is a very different one.
These are general planning ranges so you can decide what level of project fits your family. Final pricing comes after Tony reviews the tree, access, height, materials, safety hardware, features, and any town or permit requirements.
Want a realistic number? Call TonyExisting treehouse checks, railing review, zipline adjustment, hardware inspection, and small tune-ups.
Decking, railings, ladders, hardware upgrades, siding repairs, slides, and feature additions.
Open-air platform with framing, decking, railings, and ladder or simple access. Great for classic backyard play.
Larger platform, stairs, slide, rock wall, rope railing, bucket pulley, bridge, or zipline-ready details.
Walls, roof, windows, real door, siding, finished details, deck, and weather protection.
Multi-tree builds, bridges, ziplines, climbing walls, finished interiors, custom trim, and larger structures.
Ranges are for planning only. Site conditions, distance, materials, design changes, permits, and specialty features can move a project above or below these examples.
Text or email Tony a few backyard photos, the tree location, your town, the approximate size you want, and the features your kids would use most.
Get a better first number
The best first estimate starts with a few simple details. You do not need perfect measurements, but photos and a rough wish list help Tony tell you whether the project is closer to an open-air 8x8, a weathertight hideaway, or a bigger adventure build.
Stand back far enough to show the whole tree, the ground around it, nearby fences, slopes, sheds, pools, and where kids would enter the treehouse.
Tell Tony where the project is, whether materials can reach the backyard easily, and if there are tight gates, steep slopes, or long carries.
Open-air 8x8 builds start at $17,000+. Weathertight 8x8 builds start at $21,000+. Bigger builds, bridges, ziplines, and finished interiors raise the scope.
Rock wall, bucket pulley, monkey bars, bridge, slide, loft net, windows, siding, and finished interiors can be added to the plan once the base structure is right.
Process
A good treehouse starts with a strong tree — then permits, materials, and schematics. Here’s how we get from your backyard to your kid’s favorite place on earth.
A quick call. Who’s climbing, what they’re dreaming up, what your backyard looks like, and what budget feels right.
Tony comes out, walks the yard, checks the tree’s species and structure, and talks through layout, access, and any permits.
A written design with materials, features, hardware, and a clear price. No surprise add-ons later.
We build on-site, keep the yard tidy, and finish with a hands-on walkthrough so kids and parents know exactly how to use everything safely.
Past projects
Every backyard is different. These illustrated examples show the kind of range we work across — from a simple platform to a full backyard adventure.
Real build photos
Finished treehouses sell the dream. Details like ladders, railings, net lofts, rock walls, slides, and live-edge siding show the craftsmanship behind it.
Safety & repairs
Treehouses live outside in New England weather. Even a great build benefits from a yearly walk-through to catch hardware fatigue, decking wear, or a tree that has grown into something new.
We service treehouses we built and treehouses we didn’t. If you have an older structure and you’re not sure it’s safe, we’ll come look.
Schedule an inspectionKind words
“Tony built the most perfect treehouse for our kids. He worked hard, was super kind to our very curious kids through the building process. We are very grateful!”
“I believe that Tony Pola is still accepting commissions for Cape Cod Treehouses: a great retreat for either parents or kids.”
As featured in WBZ NewsRadio — “Cape Cod Company Builds Treetop Palaces”
FAQ
Sometimes. It depends on your town, the size and height of the structure, and how it’s attached. Once we walk your yard, Tony can tell you what your specific town in Massachusetts is likely to require — and help you handle it.
Strong, mature hardwoods like oak, maple, and beech are favorites. Cape Cod pines can work for the right design. The honest answer is that the tree comes first — we’ll look at species, health, branch structure, and lean before we promise anything.
An 8x8 open-air treehouse starts at $17,000+. An 8x8 weathertight treehouse starts at $21,000+. Bigger decks, bridges, ziplines, climbing walls, finished interiors, height, and difficult access can increase the price. We’ll give you a written proposal with no surprise add-ons after we see the site.
Yes. We build to hold adults, which means kids are very, very safe. Plenty of our clients confess that the treehouse becomes a quiet reading spot for the grown-ups too.
Yes. We inspect, repair, and upgrade treehouses we didn’t build all the time. If you have an older structure and you’re unsure it’s still safe, we’ll come take a look.
Call Tony at 508-654-6939 or email tony@capecodtreehouse.com. A short conversation is enough to know whether to schedule a site visit.
Start a project
The fastest way to get a real answer is a quick phone call with Tony. Or send a note — describe your trees, your kids, and what you’re dreaming up.